MARC has affirmed its AAAIS rating on TNB Western Energy Berhad’s Sukuk of up to RM4.0 billion with a stable outlook. TNB Western Energy is the funding vehicle of parent
TNB Manjung Five Sdn Bhd, a wholly-owned subsidiary of TNB. The rating and
outlook are equalised with Tenaga Nasional Berhad’s (TNB) corporate credit
rating of AAA/stable on the basis of the rolling guarantee and commitment from
the national utility company. TNB has given an undertaking to maintain full
ownership of TNB Western Energy through TNB Manjung Five which has operational
proximity to the project sponsor and offtaker TNB. TNB Manjung Five was awarded a 25-year power purchase
agreement (PPA) by TNB on August 16, 2013 to design, construct, own, operate
and manage a 1,000-MW ultra-supercritical coal-fired power plant. Sited on a
reclaimed island at Manjung, Perak, the power plant commenced operations on
September 28, 2017. TNB Manjung Five has contracted sister company TNB
Repair & Maintenance Sdn Bhd (TNB Remaco) to operate and maintain the power
plant under a 25-year operation and maintenance agreement (OMA). MARC views the
O&M provider as experienced and competent. While the liabilities of TNB
Remaco under the OMA are capped at a level which exposes TNB Manjung Five to
the risk of revenue losses, MARC believes that the O&M provider will be
sufficiently motivated to resolve issues promptly. Meanwhile, fuel supply risk
is adequately addressed through a long-term coal supply and transportation
agreement with TNB Fuel Services Sdn Bhd. The risk is further mitigated by the
close proximity between TNB Manjung Five and neighbouring power plants, which
allows the plants to share coal yard and jetty facilities. During the period under review, TNB Manjung Five
received capacity revenue of RM78.0 million and RM148.6 million in 2017 and
1H2018, which were in line with the budget as the plant registered an unplanned
outage rate below the PPA-specified unplanned outage limit. However, the plant
did not manage a full fuel cost pass-through as the heat rates were higher than
the PPA requirements. This led to 10.9% lower receipts in energy payments (EP)
from the budgeted amount in 2017. TNB Remaco has taken remedial measures to
address these issues, resulting in an improved heat rate performance in 1H2018.
MARC will continue to monitor the heat rate performance to evaluate the impact
EP losses would have on TNB Manjung Five’s financial profile. Under the latest base case projections, the project is forecast to have minimum and average pre-distribution finance service cover ratios (FSCR) with cash of 0.76x and 1.21x during the sukuk tenure. MARC notes that the projected FSCRs are lower than other MARC-rated independent power producers, signalling lower resilience to operational issues. Based on MARC’s sensitivity analysis, the project’s cash flow coverage is susceptible to reduction in CP receipts and heat rate underperformances. MARC expects TNB’s
rolling guarantee to adequately address any deterioration in the financial
capacities of TNB Western Energy and TNB Manjung Five in meeting the sukuk
repayments in the event of any major or prolonged issue affecting the power
plant. The rolling guarantee covers scheduled semi-annual distributions on the
sukuk on a non-accelerable basis. Any changes in TNB Western Energy’s rating
and/or outlook would be primarily driven by a revision to TNB’s rating and/or
outlook. Major Rating Factors Strengths
Challenges/Risks
|
|||||||